Description: 1. Layout demo. Demonstrate the right position of equipments, instruments and ground off-set facilities in actual drilling fields. Enhancing trainee's perception and studying interest towards on the drilling operation 2. General simulation and demo of structure and operation principle of the drilling operation's six main systems. ①Dynamical system: Demonstrate different kinds of equipment layout, principles and transmission path etc which supply power to the drill machine. ②Lift system: Demonstrate the process of driller infixing, making a trip, controlling drill pressure, the drill bit infixing and the operating principle of winch, traveling system and the tong. ③Rotary system: Demonstrate the principle of drill pipe rotation infix which drived by the top driver motor unit. ④Circulating system: Through the mud circulation pipeline demonstrates action of every mud sump, principle of oscillating screen, process of mud circulation and etc required by well drilling technology. ⑤Well control system: Include blowout preventer unit, accumulator and driller's control cabinet, throttle manifold and well-press blowpipe manifold. Demonstrate the actions could be taken to fight against the complex situation which could happened under the well in the drilling process, and how to restore the normal situation. ⑥Monitoring system: Demonstrate through the instrument of driller's control cabinet to measure and record the hook load, bit pressure, rotation rate and pumping pressure, drilling rate. 3.Demonstrate the scene drilling technology principle and operating essentials of whole drilling process that from top drive unit driving the motor to rotate and bring drill stem and drill bit to rotate for infixing to making trip, collect stands, driller operating, mud circulation and power wheel driver. 4.Train the students' practice skill and capability to handling problems. At experimental time, students should do in oneself,through altering the rotary speed, drill pressure, pumping pressure, simulated formation pressure practically observe the influence to the drill speed exerted by the factors above Details:
|
No.1, Bei Yi Xiang, Damucang Hutong, Xidan, Beijing P.R.C.100032
Copyright © 2009 China Educational Instrument & Equipment Corp. All rights reserved.
Damucang Hutong, Xidan, Beijing P.R.C.100032