Models


What's New
12
Our Catalogs
1

  • product.jpg
  • product.jpg

DRILLING RIG SYSTEM

PN:0210300016

Name
*Email
Phone
*Country
*Comment
*Required Fields
  • Send an E-mail
  • Call CEIEC
  • Send a Letter or Fax

  • Description
  • Scope of Supply
  • Literature
  • Accessories
  • Downloads

Description:

1. Layout demo. Demonstrate the right position of equipments, instruments and ground off-set facilities in actual drilling fields. Enhancing trainee's perception and studying interest towards on the drilling operation

2. General simulation and demo of structure and operation principle of the drilling operation's six main systems.

①Dynamical system: Demonstrate different kinds of equipment layout, principles and transmission path etc which supply power to the drill machine.

②Lift system: Demonstrate the process of driller infixing, making a trip, controlling drill pressure, the drill bit infixing and the operating principle of winch, traveling system and the tong.

③Rotary system: Demonstrate the principle of drill pipe rotation infix which drived by the top driver motor unit.

④Circulating system: Through the mud circulation pipeline demonstrates action of every mud sump, principle of oscillating screen, process of mud circulation and etc required by well drilling technology.

⑤Well control system: Include blowout preventer unit, accumulator and driller's control cabinet, throttle manifold and well-press blowpipe manifold. Demonstrate the actions could be taken to fight against the complex situation which could happened under the well in the drilling process, and how to restore the normal situation.

⑥Monitoring system: Demonstrate through the instrument of driller's control cabinet to measure and record the hook load, bit pressure, rotation rate and pumping pressure, drilling rate.

3.Demonstrate the scene drilling technology principle and operating essentials of whole drilling process that from top drive unit driving the motor to rotate and bring drill stem and drill bit to rotate for infixing to making trip, collect stands, driller operating, mud circulation and power wheel driver.

4.Train the students' practice skill and capability to handling problems. At experimental time, students should do in oneself,through altering the rotary speed, drill pressure, pumping pressure, simulated formation pressure practically observe the influence to the drill speed exerted by the factors above

Details:

Top-driven petroleum drilling simulation teaching platform includes up-ground, underground, analog control system and remote monitoring system

1. Up-ground part: Include head-frame, winch, traveling block, bridge, top-drive equipment, blowout preventer unit, diesel equipment, slurry pump, mud sump, mud circulation pipeline and ground auxiliary facility etc.

①head-frame: This equipment system adopts front-open type head-frame.

②Winch: Lift system device, be used to get up and down the drilling tool.

③Traveling block: movable block group which can move up and down in the head-frame interior

④Bridge: fix block group fixed on the top of head-frame.

⑤Which is one rig set fixed at the inner space of the head-frame and suspended by traveling block. Rotate the drill stem directly from the up-space of head-frame and down advance follow the special-guide way inside the head-frame, to accomplish the operation such as rotating footage, the back reaming, circulation of drilling fluid

⑥blowout preventer unit: include annular blowout preventer unit, slider blowout preventer unit.

⑦diesel equipment: Supply drive force for power set. It is the power source secure electric drilling machine normally working.

⑧slurry pump: Carry out the rock chips and supply power for down-well power drill and transmit and circulate the drilling fluid at drilling process.

⑨Sensor: Include displacement transducer, load transducer and pressure transducer, each sensor signals are processed and displayed on the touch screen of the simulated control system of the top-drive device.

2. underground parts: Include drilling rod, drill bit, tub assembly etc (Figure 4)

①drilling rod: The basic part of the drill string, it is used to deepen borehole, transfer torque, form drilling fluid circulating path.

②drill bit: the most important unit in the drilling progress. it is used to dig in strata and enlarge of the wellbore

③Tub assembly: Which are made of transparent materials, it is used to simulate and observe the drilling progress

3. Analog control system: Include top driven analog control platform and hydraulic governing station.

ⅠTop driven analog control platform

Its operation is through the touch screen to control the operation and stoppage of the drilling platform. There is two operation mode: Manual and Auto,we also can check the real-time data curve

�? hydraulic governing station

4. Remote monitoring system: Include high collocated computer, monitoring software etc. It is designed to monitor the drilling process synchronously.




No.1, Bei Yi Xiang, Damucang Hutong, Xidan, Beijing P.R.C.100032

Copyright © 2009 China Educational Instrument & Equipment Corp. All rights reserved.

Damucang Hutong, Xidan, Beijing P.R.C.100032

Name
*Email
Phone
*Country
*Comment
*Required Fields
  • Send an E-mail
  • Call CEIEC
  • Send a Letter or Fax